At present, the power grids of many countries are still using transformers and power distribution equipment that have been in operation for decades. With the growth of electricity demand, the expansion of industrial facilities and the continuous improvement of urban infrastructure, some old equipment has become difficult to meet the current operating requirements. Therefore, power grid upgrading projects are bringing new demand for power transformers.
For power companies, EPC general contractors and electrical equipment buyers, the choice of transformers cannot only depend on the rated capacity and quotation. Before the official purchase, there are still some technical details that need to be confirmed in advance.
First confirm the voltage level and capacity requirements
Transformer selection must first clarify the actual operating requirements of the power grid, including primary-side voltage, secondary-side voltage, rated capacity, frequency, and estimated load.
In power distribution projects, common voltage combinations include 11/0.4kV, 20/0.4 kV, and 33/0.4kV.For large substations, it is also necessary to determine a higher voltage level based on the grid design.
Capacity selection is equally important.If the capacity is too small, it may not be able to meet future load growth; if the capacity is too large, it will increase the initial procurement cost.It is best for buyers to provide load conditions and future expansion plans in advance so that the manufacturer can determine the appropriate transformer specifications.
Select the transformer type according to the application scenario
Both oil-immersed transformers and dry transformers have a wide range of applications, but the applicable scenarios of the two are not exactly the same.
Oil-immersed transformers are mainly used in outdoor substations, power distribution networks and industrial power supply systems. It uses insulating oil for cooling and insulation, and is suitable for a variety of power transmission and distribution scenarios.
Dry transformers are more used in hospitals, commercial buildings, factories and indoor substations. Since no insulating oil is used, it has certain advantages in places with special requirements for fire safety and environmental conditions.
The specific choice of which one should be combined with the installation location, capacity, ventilation conditions, maintenance requirements and relevant local regulations to make a comprehensive judgment.
Don't just compare the purchase price, but also pay attention to the loss
Transformer loss will directly affect the long-term operating cost of equipment. When purchasing, special attention needs to be paid to no-load loss and load loss.
No-load loss mainly comes from the iron core, which will continue to occur as long as the transformer is in a live state. The load loss is mainly related to the winding and will vary with the operating current.
For transformers that operate continuously for a long time, these losses may form a large electricity bill during the entire service cycle. The core material, winding design, and manufacturing process all affect the final loss level.
Some power distribution projects can also consider using amorphous alloy transformers to reduce no-load losses.Buyers should confirm specific loss limits and technical requirements in accordance with the energy efficiency regulations of the target market.
Consider the actual installation environment
Transformers suitable for ordinary indoor environments are not necessarily suitable for high-temperature industrial plants or coastal substations.
Ambient temperature, altitude, humidity, dust and ventilation conditions may all affect the operating performance of the transformer.
Oil-immersed transformers need to choose the appropriate cooling method according to the design and operating requirements, such as ONAN or ONAF. Dry transformers need to confirm whether they are naturally air-cooled or forced air-cooled.
For projects in tropical, desert and coastal areas, this information is best explained to the manufacturer at the inquiry stage.
Confirm the implementation of standards, accessory configuration and factory tests
IEC 60076 is a series of international standards widely used in the design and testing of power transformers. However, for different countries and projects, it may also involve local power grid specifications, owner technical requirements, and additional energy efficiency regulations.
Buyers need to clarify the insulation level, impedance, voltage connection group and protection configuration. At the same time, accessories such as temperature indicators, oil level gauges, pressure release valves and thermostats should also be confirmed one by one in the technical specifications.
The factory test can also not be ignored. Conventional tests usually include winding resistance measurement, voltage ratio test, impedance measurement, no-load loss and load loss measurement, and insulation test. Some projects will also require factory acceptance tests or third-party inspections.
Clarifying the scope of the test in advance can reduce the problems in the later equipment acceptance and delivery process.
Choose a transformer manufacturer that understands the needs of the project
In addition to whether the product itself meets the technical requirements, the supplier's manufacturing capabilities and service capabilities are also worthy of attention. Buyers should understand the factory's production experience, quality control processes, technical support capabilities, and delivery arrangements.
Kechang Electric (Tianjin Kechang International Trade Co., Ltd.) Relying on the manufacturing base located in Xushui Economic Development Zone, Hebei, to provide domestic and foreign customers with power equipment and power distribution solutions. The company has more than 18 years of industry experience, and its main products include oil-immersed transformers, dry transformers, amorphous alloy transformers, box-type substations, and high and low voltage switchgear.
In terms of product innovation and technology accumulation, the company owns 19 computer software copyrights, 39 patent certificates and 35 independent intellectual property rights.
For projects with different voltage levels, capacities and installation environments, Kechang Electric can communicate technical specifications and equipment configurations with customers before production to assist in confirming product solutions suitable for project needs.
Conclusion
The selection of transformers in power grid upgrade projects does not just determine the voltage level and capacity. Equipment loss, installation environment, protection configuration, test requirements, and the actual capabilities of the manufacturer all need to be included in the procurement considerations.
Providing complete technical information in the early stages of the project helps to obtain a more accurate quotation, and can also reduce the communication costs in the subsequent design modification and delivery process.